EMS portrait for Lynus AG
- Company
- Lynus AG
- Company headquarters
- Tuggen, Switzerland
- Energy management system (EMS)
- Lynus
- Website
- https://lynus.io/
General information
main target group |
|
secondary target group |
|
Utility service | electricity, heating, water |
Do Swiss customers belong to your target group? | Yes, they belong to our main target group |
Functions for real estate
Offer for utilities
Specifications
Interfaces to utility systems |
|
Commercialisation by utilities | Yes, with white label under certain conditions |
METAS certification | No, certification by METAS is not (yet) planned. |
Compatible Components
Electricity meter |
Standard offer available
|
Heat meter |
Standard offer available
|
Water meter |
Standard offer available
|
Inverter/PV system |
Standard offer available
|
Battery storage |
Standard offer available
|
Heat pump |
Standard offer available
|
Combined heat and power plant (CHPP) |
Standard offer available
|
Water boiler |
Standard offer available
|
Other heating systems |
Standard offer available
|
Heat storage |
Standard offer available
|
EV-charging station |
Standard offer available
|
Smart Home elements |
Standard offer available
|
Average cost to implement new producers (driver development) |
Not stated
|
Technical information
Operating elements |
|
Components of the product |
|
Interfaces to components |
|
Communication interfaces | GSM, LAN |
SmartGridready | No, a declaration is not (yet) planned |
Integration of third-party systems to influence hardware | Standard offer under development |
Control and regulation mechanisms | If-Then Functions, Algorithms (consideration of several factors), Self-learning algorithms |
Control of components | Centrally in a control box (local), Centrally in a control box (cloud) |
Intervals for data measurement and transmission
Data measurement for control | In real time (up to 5 seconds) |
Data measurement for electricity billing | Real time (up to 5 seconds) |
Data measurement for e-mobility billing | Real time (up to 5 seconds) |
Data measurement for heat billing | Real time (up to 5 seconds) |
Data measurement for water billing | Real time (up to 5 seconds) |
Data transmission | In real time (up to 5 minutes) |
Installation & Operation
When purchased via utility | Installation by EMS provider, Specialist partner, utility, External installer |
When purchsed via EMS provider | Installation by EMS provider, Specialist partner, utility, External installer |
When purchased via wholesale | Installation by EMS provider, Specialist partner, utility, External installer |
Comment on installation | The specialist partner is always trained by Lynus |
Duration of installation at the end customer | 1-2 days |
Software updates | 4x yearly |
Softwar updates - how | Automatic process |
Software updates - who | Lynus AG |
Warranty | 10 years |
Lifetime | 15 years |
Data protection and IT security
Data protection guarantee | The data is stored centrally in Switzerland in a Swiss Cloud. |
Data storage | Cloud - in Switzerland |
Certification of Cloud solution | ISO 27000 |
Access protection of ERM (App/Cloud) | HTTPS |
Access protection of decentralized units | Not stated |
Data security on decentralized units | Not stated |
Protection of data exchange with peripheral systems and decentralized units | Not stated |
Encryption of data in-transfer and in-storage | Partially, if required |
Costs
Costs at building level
These are rough estimates. An offer must be requested for exact cost information.
The following use case was assumed for the cost estimate:
1 Multi-party residential building with the following components (excluding commercial):
- Measuring units: 20 electricity meters, 20 heat meters, 20 water meters (hot & cold)
- 1 photovoltaic system (with 1 inverter)
- 1 heat pump (SG-Ready)
- 1 hot water boiler
- 20 parking spaces, 5 of which are fully equipped with charging stations
-
Of these, the following functions can be fulfilled:
Measure electricity meterMeasure heat meterMeasure water meterIntegration PV systemControl heat pumpControl water boilerDynamic load managementData delivery consumption charging stations for billing (without collection)Implementation ZEV (pure data delivery - no collection) -
Of these, the following functions cannot be fulfilled:
One-time hardware costs | CHF1,500 |
One-time software costs | CHF2,750 |
Total of one-time costs | CHF4,250 |
Project management costs | CHF160 per hour |
Annual costs | CHF0 |
Deviation/discounts for portfolio with 100 buildings (per building) | none |
Information about the company
Establishment in Switzerland | Yes, we are compatible with the Swiss system: currency, tariff system, etc. |
Do you already work together with utilities? |
Yes
With:: approx. 5 utilities |
Other partners/clients | Specialist partners |
Number of installations in Switzerland | 50 objects approx. 500 apartments |
Number of installations in Europe (incl. Switzerland) | approx. 200 Objects |
Founding year | 2020 |
Number of FTE | 20 |